FAQ
What does a restaurant build-out cost in NYC?
A cold-shell restaurant build-out commonly runs $200 to $400 or more per square foot before kitchen equipment and furniture. That figure is from the LNB Construction planning guide, which describes it as a mid-cost US market, not a New York City bid. A We Sell Restaurants guide puts a new restaurant build-out at $150 to $300 per square foot. Neither number is All American Construction Group project data. The price for a suite comes from a walkthrough.
Is a second-generation restaurant space cheaper?
It can be, when the hood, grease interceptor, and walk-in fit the menu and the agencies will accept them. LNB Construction says a well-equipped second-generation restaurant can come in well under the cold-shell band. We Sell Restaurants says cosmetic updates and branding in a second-generation space may cost as little as $50 per square foot. If the hood is the wrong size, the interceptor fails the current rule, or the kitchen has to move, that saving goes away.
What drives the hood and fire-suppression cost?
LNB Construction lists a Type I hood with fire suppression and an exhaust fan at $25,000 to $75,000 or more, and a make-up air unit at $10,000 to $40,000. The duct route and the roof usually decide the total. In New York City, the FDNY Restaurant Fire Safety Guide says the cooking exhaust system is filed, installed, and approved by the Department of Buildings. An FDNY permit to maintain or operate the system costs $70 per system and is renewed every year. That fee is not the installation price.
Which NYC permits does a restaurant build-out touch?
Confirm zoning, review the plans, and file the construction with the Department of Buildings. Commercial cooking exhaust goes through DOB and then the FDNY Rangehood Unit. The Department of Health and Mental Hygiene issues the Food Service Establishment Permit. The NYC Business restaurant checklist says you may begin to operate on the 22nd day after you submit that application, and you must pass an unannounced pre-permit inspection. Opening sooner means calling (212) 676-1600 to schedule a pre-operational inspection. A Food Protection Certificate holder must be on site while food and drink are prepared. Char broilers and cook stoves are registered with the Department of Environmental Protection. A gathering of 75 or more people needs a Place of Assembly permit. A landmarked building needs Landmarks Preservation Commission approval before work starts.
Does the per-square-foot range include equipment, furniture, and permits?
No. LNB Construction says cooking and refrigeration equipment, furniture, design and engineering fees, and health-department and permit fees are usually outside the construction number. A sign that is fastened to the building or illuminated needs Department of Buildings approval, and that filing is separate.
How long does a NYC restaurant build-out take?
There is no single published duration. The calendar follows zoning and the lease, plan review, construction, FDNY tests, and the health-department application. A second-generation kitchen that the agencies accept shortens construction. It does not skip those steps. All American Construction Group gives a timeline for a specific space after the walkthrough.
Do you work with New Jersey operators?
Yes. All American Construction Group takes restaurant and QSR build-out inquiries for New York City and New Jersey. Fixt on-site repair jobs stay in New York ZIP codes 100-149. This page is not the homeowner bid marketplace.
What credentials does All American Construction Group publish?
It is a New Jersey registered business, it holds a New Jersey Public Works Contractor Registration, and it is insured.
How do I request a walkthrough or estimate?