Restaurant build-out cost in NYC

A cold-shell restaurant build-out commonly runs $200 to $400 or more per square foot before kitchen equipment and furniture. That range is from the LNB Construction planning guide, which calls it a mid-cost US market. It is not a New York City quote, and it is not All American Construction Group project data. A walkthrough is how AACG prices the suite you are about to lease.

✓ New Jersey registered business✓ NJ Public Works Contractor Registration✓ Insured✓ Powered by Fixt

Short answers

What should I budget?

Use the cold-shell band of $200 to $400 or more per square foot as a planning ceiling before equipment and furniture. A second-generation kitchen that still fits the menu can land under that. Get the real number from a walkthrough of this space.

White box or second generation?

A white box still needs the hood, gas, electrical capacity, drains, and grease interceptor. A second-generation restaurant may already have them. Reuse saves money only when those systems fit and the agencies accept them.

Who is this for?

Franchisees and new operators opening or renovating a restaurant or QSR in New York City or New Jersey. Fixt on-site repair jobs stay in ZIP codes 100–149. This page is the construction inquiry, not the homeowner bid marketplace.

Cost ranges by scope

Typical industry planning ranges. They are not All American Construction Group bids, not a New York City average, and not a promise for your suite. Labor, a Department of Buildings filing, and the condition of the building move a New York job relative to a national band.

Sources are listed under the table. Dollar figures appear only where those sources publish them.
ScopeTypical industry rangeWhat the range means
White box / cold shell$200 to $400 or more per sq ft before kitchen equipment and furnitureLNB Construction, described there as a mid-cost US market. We Sell Restaurants puts a new restaurant build-out at $150 to $300 per sq ft. Not a New York City bid.
Second-generation restaurantUnder the cold-shell band when the kitchen infrastructure fits; cosmetic work as little as $50 per sq ftLNB Construction: well under the cold-shell figure if the hood, grease interceptor, and walk-in suit the menu. We Sell Restaurants: cosmetic updates and branding may be as little as $50 per sq ft.
Kitchen and MEPGrease interceptor $5,000 to $30,000 or more. Walk-in cooler and freezer $10,000 to $40,000. Gas and electrical service vary widely.LNB Construction. Gas and electrical move when the suite was built for ordinary retail and the meter or panel is too small for the line.
Hood and fire suppressionType I hood, fire suppression, and exhaust fan $25,000 to $75,000 or more. Make-up air $10,000 to $40,000. FDNY operating permit $70 per system per year.Installation ranges are from LNB Construction. The $70 fee is from the FDNY Restaurant Fire Safety Guide and is not the cost to build the hood.
ADA and accessNo dollar range is published in the sources above.The NYC Business checklist says plans have to comply with the building and fire codes. Accessible route, restrooms, and service counters are priced from what this space already has. AACG does not use a flat allowance.
Permits and DOB filingUsually outside the per-square-foot construction number. FDNY commercial-cooking permit is $70 per system per year.LNB Construction lists health-department and permit fees, plus design and engineering, as items usually left out of the construction number. Agency steps are below.
TimelineNo single published NYC duration.The sequence is zoning and lease, plan review, construction, FDNY tests, then the health-department application. A usable second-generation kitchen shortens construction. It does not skip the permits. AACG states a duration for the space after the walkthrough.

What moves the number

What you start with

A white box still needs the kitchen infrastructure. A second-generation restaurant may already have a hood, interceptor, and walk-in. Reuse only counts when the equipment fits the menu and the agencies accept it.

The cooking line

Grease-producing equipment drives the hood, the welded duct, make-up air, gas, and electrical capacity. LNB Construction notes that two hoods of the same length can be priced far apart because the duct route and the roof decide the total.

Slab and utilities

Moving floor sinks and drains means cutting the slab. An in-ground grease interceptor is a different job from an under-counter trap. A retail panel or a small gas meter often has to be upgraded before the kitchen can run.

The building

A landmarked building needs Landmarks Preservation Commission approval before work starts. A room where 75 or more people gather needs a Place of Assembly permit. Both come from the NYC Business restaurant checklist, and both sit on the calendar before opening.

NYC permit steps, in order

This is the general path from the NYC Business restaurant checklist and the FDNY Restaurant Fire Safety Guide. It is not a filing checklist for a specific address, and it does not replace the architect of record.

1. Zoning and the lease

NYC Business tells operators to confirm the location is zoned for the business, and to use the Department of City Planning ZoLa map. Read the lease before signing. A lawyer, or the free Small Business Services lease help, is what the City checklist suggests.

2. Department of Buildings

Have an architect or designer plan the work so it meets the building and fire codes. Small Business Services offers free plan examinations. Signs that are fastened to the building or illuminated need DOB approval. Construction stays inside the approved plans.

3. FDNY range hood

The FDNY Restaurant Fire Safety Guide says the cooking exhaust system is filed, installed, and approved by DOB. The Rangehood Unit inspects the exhaust and the extinguishing system, witnesses the acceptance test, and witnesses the exhaust performance test. The guide says the extinguishing system is installed by a NYC DOB licensed Class A or C master fire suppression piping contractor. That is the City requirement for that trade. It is not a credential claimed for All American Construction Group. The FDNY permit to maintain or operate the system is $70 per system and renews every year.

4. DOHMH food service establishment

Apply for the Food Service Establishment Permit. NYC Business says you may begin to operate on the 22nd day after you submit the application, even if you have not yet been inspected, and you must pass an unannounced pre-permit inspection to receive the permit. To open earlier, call (212) 676-1600 and schedule a pre-operational inspection. A Food Protection Certificate holder must be on site during food and drink preparation.

5. DEP, assembly, and landmarks

Register char broilers and cook stoves with the Department of Environmental Protection. Plan a Place of Assembly permit when 75 or more people will gather. If the building is landmarked or in a historic district, get Landmarks Preservation Commission approval before work begins.

After opening, facility prep for a health inspection is a different job from the build-out. The NYC restaurant inspection checklist cites the Health Code sections it uses, and AACG Maintenance is the monthly store plan.

FAQ

What does a restaurant build-out cost in NYC?

A cold-shell restaurant build-out commonly runs $200 to $400 or more per square foot before kitchen equipment and furniture. That figure is from the LNB Construction planning guide, which describes it as a mid-cost US market, not a New York City bid. A We Sell Restaurants guide puts a new restaurant build-out at $150 to $300 per square foot. Neither number is All American Construction Group project data. The price for a suite comes from a walkthrough.

Is a second-generation restaurant space cheaper?

It can be, when the hood, grease interceptor, and walk-in fit the menu and the agencies will accept them. LNB Construction says a well-equipped second-generation restaurant can come in well under the cold-shell band. We Sell Restaurants says cosmetic updates and branding in a second-generation space may cost as little as $50 per square foot. If the hood is the wrong size, the interceptor fails the current rule, or the kitchen has to move, that saving goes away.

What drives the hood and fire-suppression cost?

LNB Construction lists a Type I hood with fire suppression and an exhaust fan at $25,000 to $75,000 or more, and a make-up air unit at $10,000 to $40,000. The duct route and the roof usually decide the total. In New York City, the FDNY Restaurant Fire Safety Guide says the cooking exhaust system is filed, installed, and approved by the Department of Buildings. An FDNY permit to maintain or operate the system costs $70 per system and is renewed every year. That fee is not the installation price.

Which NYC permits does a restaurant build-out touch?

Confirm zoning, review the plans, and file the construction with the Department of Buildings. Commercial cooking exhaust goes through DOB and then the FDNY Rangehood Unit. The Department of Health and Mental Hygiene issues the Food Service Establishment Permit. The NYC Business restaurant checklist says you may begin to operate on the 22nd day after you submit that application, and you must pass an unannounced pre-permit inspection. Opening sooner means calling (212) 676-1600 to schedule a pre-operational inspection. A Food Protection Certificate holder must be on site while food and drink are prepared. Char broilers and cook stoves are registered with the Department of Environmental Protection. A gathering of 75 or more people needs a Place of Assembly permit. A landmarked building needs Landmarks Preservation Commission approval before work starts.

Does the per-square-foot range include equipment, furniture, and permits?

No. LNB Construction says cooking and refrigeration equipment, furniture, design and engineering fees, and health-department and permit fees are usually outside the construction number. A sign that is fastened to the building or illuminated needs Department of Buildings approval, and that filing is separate.

How long does a NYC restaurant build-out take?

There is no single published duration. The calendar follows zoning and the lease, plan review, construction, FDNY tests, and the health-department application. A second-generation kitchen that the agencies accept shortens construction. It does not skip those steps. All American Construction Group gives a timeline for a specific space after the walkthrough.

Do you work with New Jersey operators?

Yes. All American Construction Group takes restaurant and QSR build-out inquiries for New York City and New Jersey. Fixt on-site repair jobs stay in New York ZIP codes 100-149. This page is not the homeowner bid marketplace.

What credentials does All American Construction Group publish?

It is a New Jersey registered business, it holds a New Jersey Public Works Contractor Registration, and it is insured.

How do I request a walkthrough or estimate?

Use the form on this page. The request is stored and emailed to husham@allamericancg.com. It does not charge a card, and it does not start the monthly maintenance plan.

Request a walkthrough or estimate

Tell us about the space. A walkthrough sets the number.

The form is stored and emailed to husham@allamericancg.com. You can also call 929-888-2848. It does not charge a card and it does not start a maintenance plan. All American Construction Group is a New Jersey registered business, holds a New Jersey Public Works Contractor Registration, and is insured.